{"id":8308,"date":"2019-09-24T11:25:32","date_gmt":"2019-09-24T09:25:32","guid":{"rendered":"https:\/\/leh-gmbh.com\/?post_type=projekt&#038;p=8308"},"modified":"2021-02-19T10:14:28","modified_gmt":"2021-02-19T09:14:28","slug":"construction-of-a-new-wastewater-distillation","status":"publish","type":"projekt","link":"https:\/\/leh-gmbh.com\/en\/projekt\/construction-of-a-new-wastewater-distillation\/","title":{"rendered":"Construction of a new Wastewater Distillation"},"content":{"rendered":"<section class=\"l-section wpb_row height_large with_img\"><div class=\"l-section-img\" role=\"img\" aria-label=\"Image\" data-img-width=\"1920\" data-img-height=\"400\" style=\"background-image: url(https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/header_abwasser.jpg);background-repeat: no-repeat;\"><\/div><div class=\"l-section-overlay\" style=\"background:rgba(2,2,2,0.45)\"><\/div><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">[vc_custom_heading source=&#8221;post_title&#8221; font_container=&#8221;tag:h1|font_size:60|text_align:center|color:%23ffffff&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;%7B%22default%22%3A%7B%22color%22%3A%22%23ffffff%22%2C%22font-size%22%3A%2260%22%7D%7D&#8221;]<div class=\"w-iconbox iconpos_top style_default color_primary align_center no_text no_title\" id=\"#textprojekt\"><div class=\"w-iconbox-icon\" style=\"font-size:2rem;\"><i class=\"fas fa-chevron-down\"><\/i><\/div><div class=\"w-iconbox-meta\"><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_medium\" id=\"textprojekt\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-9 wpb_column vc_column_container us_animate_afl\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>A global player in the pharmaceutical industry commissioned Lehmann Engineering GmbH with the construction of a new distillation plant for Propanol and MEK solvents. Without wastewater distillation, the use of an endless row of trucks would be necessary for the disposal of the spent, aqueous solvents. Thanks to the wastewater distillation, the solvents are deprived of water and the polluted solvents are then concentrated and properly disposed of.<\/p>\n<h3 class=\"p3\"><span class=\"s1\">Task<\/span><\/h3>\n<p>The task of Lehmann Engineering GmbH was the creation of requirement specifications for the integration of the new technology into the Optical Fibres Network, the distillation and the installation of a day tank and truck tank farm. Of course, the entire technology is subject to the requirements of GMP and SIL as well as the applicable water legislation.<\/p>\n<h3 class=\"p1\"><span class=\"s1\">Solution<\/span><\/h3>\n<p>Lehmann Engineering GmbH was responsible for the necessary planning and tendering procedures regarding the disposal of the special waste solvents. Being part of the construction supervision, the GMP steps (e.g., FAT, SAT, IQ) have been integrated. The audits according to SIL and the requirements of explosion protection were carried out by SGS T\u00dcV Saar GmbH (Technical Inspection Authority).<br \/>\nConclusion: The project was implemented successfully even before the scheduled deadline and received great recognition from the SGS T\u00dcV Saar GmbH.<\/p>\n<h3>Advantages for our customer<\/h3>\n<p>This project provided our customer with a cost-saving and forward-looking solution, especially by integrating the new technology into the fiber optic network.<br \/>\nAlso in this project we are proud of the completion of the customer project even before the end of the planned deadline. Adherence to deadlines is our credo.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"vc_col-sm-3 wpb_column vc_column_container us_animate_afr\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-post-elm post_image stretched\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt_abwasser.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt_abwasser.jpg 600w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt_abwasser-300x300.jpg 300w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt_abwasser-150x150.jpg 150w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt_abwasser-100x100.jpg 100w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt_abwasser-200x200.jpg 200w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h6 class=\"p1\"><span class=\"s1\"><strong>Magnitude<\/strong><\/span><\/h6>\n<ul>\n<li>Above-ground tanks, 2 x 180&#215;000 litres<\/li>\n<li>Distillation as a package unit<\/li>\n<\/ul>\n<h6 class=\"p1\"><span class=\"s1\"><strong>Investment amount<\/strong><\/span><\/h6>\n<p>2.8 Million Euros<\/p>\n<h6 class=\"p1\"><span class=\"s1\"><strong>Duration<\/strong><\/span><\/h6>\n<p>8 months<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-post-elm post_navigation layout_simple inv_false\"><a class=\"post_navigation-item order_first to_prev\" href=\"https:\/\/leh-gmbh.com\/en\/projekt\/building-fibre-optic-network\/\" title=\"Networking with a Fibre Optic Ring\"><div class=\"post_navigation-item-arrow\"><\/div><div class=\"post_navigation-item-meta\">Previous Post<\/div><div class=\"post_navigation-item-title\"><span>Networking with a Fibre Optic Ring<\/span><\/div><\/a><a class=\"post_navigation-item order_second to_next\" href=\"https:\/\/leh-gmbh.com\/en\/projekt\/construction-of-a-new-buffer-tank-farm\/\" title=\"Construction of a new Buffer Tank Farm\"><div class=\"post_navigation-item-arrow\"><\/div><div class=\"post_navigation-item-meta\">Next Post<\/div><div class=\"post_navigation-item-title\"><span>Construction of a new Buffer Tank Farm<\/span><\/div><\/a><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":8750,"template":"","projektkategorie":[44],"class_list":["post-8308","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","projektkategorie-pharmazie-en"],"_links":{"self":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projekt\/8308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/media\/8750"}],"wp:attachment":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/media?parent=8308"}],"wp:term":[{"taxonomy":"projektkategorie","embeddable":true,"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projektkategorie?post=8308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}