{"id":8313,"date":"2019-09-05T11:53:25","date_gmt":"2019-09-05T09:53:25","guid":{"rendered":"https:\/\/leh-gmbh.com\/projekt\/vernetzung-mit-einem-lichtwellenleiterring-aus-glas\/"},"modified":"2020-04-02T16:06:47","modified_gmt":"2020-04-02T14:06:47","slug":"building-fibre-optic-network","status":"publish","type":"projekt","link":"https:\/\/leh-gmbh.com\/en\/projekt\/building-fibre-optic-network\/","title":{"rendered":"Networking with a Fibre Optic Ring"},"content":{"rendered":"<section class=\"l-section wpb_row height_large with_img\"><div class=\"l-section-img\" role=\"img\" aria-label=\"Image\" data-img-width=\"1920\" data-img-height=\"400\" style=\"background-image: url(https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/header_glasfaser1.jpg);background-repeat: no-repeat;\"><\/div><div class=\"l-section-overlay\" style=\"background:rgba(2,2,2,0.45)\"><\/div><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">[vc_custom_heading source=&#8221;post_title&#8221; font_container=&#8221;tag:h1|font_size:60|text_align:center|color:%23ffffff&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;%7B%22default%22%3A%7B%22color%22%3A%22%23ffffff%22%2C%22font-size%22%3A%2260%22%7D%7D&#8221;]<div class=\"w-iconbox iconpos_top style_default color_primary align_center no_text no_title\" id=\"#textprojekt\"><div class=\"w-iconbox-icon\" style=\"font-size:2rem;\"><i class=\"fas fa-chevron-down\"><\/i><\/div><div class=\"w-iconbox-meta\"><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_medium\" id=\"textprojekt\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-9 wpb_column vc_column_container us_animate_afl\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p class=\"p3\">In order not to shut down the entire production process in the event of a fire, a manufacturer of pharmaceutical-optical devices commissioned Lehmann Engineering GmbH with the networking of a fibre optic ring made of glass. Aim was the integration of an &#8220;emergency stop&#8221; to stop only the hazardous area and the directly affected production facilities in the event of a malfunction.<\/p>\n<h3 class=\"p3\"><span class=\"s1\">Task<\/span><\/h3>\n<p>Task of the Lehmann Engineering GmbH was the development of a reliable solution, which in the case of malfunctions (for example fire risk, leakage, maintenance, etc.) only stops the affected units and not the entire production area. For this purpose, the entire production &#8211; from the tank farm via several production facilities to waste disposal &#8211; was networked with a glass fibre optic cable ring. The goal is to keep production downtime as low as possible in order to resume operations as quickly as possible and to achieve greater profitability at the same safety level.<\/p>\n<h3 class=\"p1\"><span class=\"s1\">Solution<\/span><\/h3>\n<p class=\"p1\">With the integration of this particular &#8220;emergency stop&#8221;, all production sections can be monitored and controlled from multiple operating stations. Siemens switches and a redundancy manager ensure that the data always stays in the flow, regardless of the direction.<br \/>\nThanks to the fail-safe Siemens S7-416F control system, the signal packets are transferred to the Remote IO (RIO) stations and controllers of the package units in the subsystems or production plants. This ensures error-free and reliable transmission of all security-relevant data. If a fault occurs in one area of the production cycle, a message is immediately sent to all other operating stations. An emergency stop button solely places the endangered environment in a safe stop state. The explosion-hazardous areas such as SIL1 shutdowns are also integrated, while all other areas can continue to work.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"vc_col-sm-3 wpb_column vc_column_container us_animate_afr\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-post-elm post_image stretched\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt-glasfaser1.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt-glasfaser1.jpg 600w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt-glasfaser1-300x300.jpg 300w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt-glasfaser1-150x150.jpg 150w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt-glasfaser1-100x100.jpg 100w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2019\/09\/projekt-glasfaser1-200x200.jpg 200w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h6 class=\"p1\"><span class=\"s1\"><strong>Magnitude<\/strong><\/span><\/h6>\n<ul>\n<li>2,400 m fibre optic cable<\/li>\n<li>16 switches<\/li>\n<li>7 controls<\/li>\n<\/ul>\n<h6 class=\"p1\"><span class=\"s1\"><strong>Investment amount<\/strong><\/span><\/h6>\n<p>350,000 Euros<\/p>\n<h6 class=\"p1\"><span class=\"s1\"><strong>Duration<\/strong><\/span><\/h6>\n<p>6 months<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-post-elm post_navigation layout_simple inv_false\"><a class=\"post_navigation-item order_first to_prev\" href=\"https:\/\/leh-gmbh.com\/en\/projekt\/construction-fibre-optics-network\/\" title=\"Construction of a Fibre Optics Network\"><div class=\"post_navigation-item-arrow\"><\/div><div class=\"post_navigation-item-meta\">Previous Post<\/div><div class=\"post_navigation-item-title\"><span>Construction of a Fibre Optics Network<\/span><\/div><\/a><a class=\"post_navigation-item order_second to_next\" href=\"https:\/\/leh-gmbh.com\/en\/projekt\/construction-of-a-new-wastewater-distillation\/\" title=\"Construction of a new Wastewater Distillation\"><div class=\"post_navigation-item-arrow\"><\/div><div class=\"post_navigation-item-meta\">Next Post<\/div><div class=\"post_navigation-item-title\"><span>Construction of a new Wastewater Distillation<\/span><\/div><\/a><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":8755,"template":"","projektkategorie":[44],"class_list":["post-8313","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","projektkategorie-pharmazie-en"],"_links":{"self":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projekt\/8313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/media\/8755"}],"wp:attachment":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/media?parent=8313"}],"wp:term":[{"taxonomy":"projektkategorie","embeddable":true,"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projektkategorie?post=8313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}