{"id":9756,"date":"2026-06-10T10:55:32","date_gmt":"2026-06-10T08:55:32","guid":{"rendered":"https:\/\/leh-gmbh.com\/?post_type=projekt&#038;p=9756"},"modified":"2026-06-10T10:56:39","modified_gmt":"2026-06-10T08:56:39","slug":"new-filling-and-sealing-machine","status":"publish","type":"projekt","link":"https:\/\/leh-gmbh.com\/en\/projekt\/new-filling-and-sealing-machine\/","title":{"rendered":"New filling and sealing machine"},"content":{"rendered":"<section class=\"l-section wpb_row height_large with_img\"><div class=\"l-section-img\" role=\"img\" aria-label=\"Image\" data-img-width=\"1920\" data-img-height=\"400\" style=\"background-image: url(https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_1920x400.png);background-repeat: no-repeat;\"><\/div><div class=\"l-section-overlay\" style=\"background:rgba(2,2,2,0.45)\"><\/div><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">[vc_custom_heading source=&#8221;post_title&#8221; font_container=&#8221;tag:h1|font_size:60|text_align:center|color:%23ffffff&#8221; use_theme_fonts=&#8221;yes&#8221; css=&#8221;%7B%22default%22%3A%7B%22color%22%3A%22%23ffffff%22%2C%22font-size%22%3A%2260%22%7D%7D&#8221;]<div class=\"w-iconbox iconpos_top style_default color_primary align_center no_text no_title\" id=\"#textprojekt\"><div class=\"w-iconbox-icon\" style=\"font-size:2rem;\"><i class=\"fas fa-chevron-down\"><\/i><\/div><div class=\"w-iconbox-meta\"><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_medium\" id=\"textprojekt\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-9 wpb_column vc_column_container us_animate_afl\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h3 class=\"p3\"><span class=\"s1\">Task<\/span><\/h3>\n<p>An old filling line consisting of two process steps, filling and sealing, is in operation at a pharmaceutical company&#8217;s site. Due to the age of the system, future system availability, production reliability, and spare parts supply can no longer be guaranteed. To ensure long-term production capability, a new, modern, and GMP-compliant filling and sealing machine must be installed.<br \/>\nThe main objective of the project is to provide comprehensive support to the customer in the field of \u200b\u200bautomation \u2013 from the early planning phase to the handover of the plant ready for operation. Project support and coordination should cover all relevant phases, such as detailed requirements analysis and technical design, support in supplier selection, and technical coordination.<br \/>\nThe goal is not just to deliver a new machine, but also to provide a process-reliable, GMP-qualified, and fully approved overall solution that can be seamlessly integrated into the existing production environment.<\/p>\n<h3 class=\"p1\"><span class=\"s1\">Solution<\/span><\/h3>\n<p class=\"p1\">To ensure successful implementation, the Lehmann Engineering project team assumed a central interface function between customer and suppliers. This support includes, in particular, managing and coordinating automation requirements, actively liaising with suppliers, conducting GMP qualification processes, and ensuring that the system meets customer and GMP requirements.<br \/>\nThis comprehensive support ensures that the new plant meets technical, qualitative, and\u2028regulatory requirements and can be safely transferred to production.<\/p>\n<h3>Customer benefits<\/h3>\n<ul>\n<li>Comprehensive handling of all automation issues from a single source<\/li>\n<li>Coordination and management of suppliers<\/li>\n<li>Ensuring GMP- and GAMP (Good Automated Manufacturing Practice)-compliant qualification of the entire system<\/li>\n<li>Support throughout the entire project, from specification to handover<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><\/div><div class=\"vc_col-sm-3 wpb_column vc_column_container\"><div class=\"vc_column-inner us_custom_47474b22 us_animate_this\"><div class=\"wpb_wrapper\"><div class=\"w-post-elm post_image stretched\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_600x600.png\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_600x600.png 600w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_600x600-300x300.png 300w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_600x600-150x150.png 150w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_600x600-100x100.png 100w, https:\/\/leh-gmbh.com\/wp-content\/uploads\/2026\/06\/P06_600x600-200x200.png 200w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p class=\"p1\"><span class=\"s1\"><strong>Investment volume<br \/>\n<\/strong><\/span>3 Million Euros<\/p>\n<p class=\"p1\"><span class=\"s1\"><strong>Project duration<br \/>\n<\/strong>3.5 years<\/span><\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-post-elm post_navigation layout_simple inv_false\"><a class=\"post_navigation-item order_first to_prev\" href=\"https:\/\/leh-gmbh.com\/en\/projekt\/feasibility-study-and-gmp-qualification-of-process-water-recycling-plant-process-water-collection-plant\/\" title=\"Feasibility study and GMP qualification of Process water recycling plant \u2028(Process water collection plant)\"><div class=\"post_navigation-item-arrow\"><\/div><div class=\"post_navigation-item-meta\">Previous Post<\/div><div class=\"post_navigation-item-title\"><span>Feasibility study and GMP qualification of Process water recycling plant \u2028(Process water collection plant)<\/span><\/div><\/a><a class=\"post_navigation-item order_second to_next\" href=\"https:\/\/leh-gmbh.com\/en\/projekt\/machine-automation-for-a-filling-and-packaging-line\/\" title=\"Machine automation for a filling and packaging line\"><div class=\"post_navigation-item-arrow\"><\/div><div class=\"post_navigation-item-meta\">Next Post<\/div><div class=\"post_navigation-item-title\"><span>Machine automation for a filling and packaging line<\/span><\/div><\/a><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":9750,"template":"","projektkategorie":[44],"class_list":["post-9756","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","projektkategorie-pharmazie-en"],"_links":{"self":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projekt\/9756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/media\/9750"}],"wp:attachment":[{"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/media?parent=9756"}],"wp:term":[{"taxonomy":"projektkategorie","embeddable":true,"href":"https:\/\/leh-gmbh.com\/en\/wp-json\/wp\/v2\/projektkategorie?post=9756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}