What we do.
We realize the majority of customer projects in the field of pharmaceuticals, foods, cosmetics and chemistry. Hereby, we focus on PPQ, which means planning, project coordination and GMP qualification. Furthermore, we use our know-how in fields which are not part of our core business. Due to our vast experience and the continuous further training of our staff members, we are able to cover a wide range of customer projects. We dispose of a great network of partner companies with whom we have been handling projects reliably and successfully for many years.
Automation
In order not to shut down the entire production process in the event of a fire, a manufacturer of pharmaceutical-optical devices commissioned Lehmann Engineering GmbH with the networking of a fibre optic ring made of glass…
Automation
In order not to shut down the entire production process in the event of a fire, a manufacturer of pharmaceutical-optical devices commissioned Lehmann Engineering GmbH with the networking of a fibre optic ring made of glass…
Automation
A global player in the beverage industry was facing the problem that the costly raw materials used to produce its beverages were not being utilized optimally during the mixing process. As a result…
Automation
A global player in the beverage industry was facing the problem that the costly raw materials used to produce its beverages were not being utilized optimally during the mixing process. As a result…
Automation
As part of a product expansion, our long-standing customer in the beverage industry wanted to expand an existing batch mixing plant to include new liquid raw material lines. This required …
Automation
As part of a product expansion, our long-standing customer in the beverage industry wanted to expand an existing batch mixing plant to include new liquid raw material lines. This required …
Automation
Due to market changes in the beverage industry, a batch processing plant comprising eight batch tanks at our client’s facility was slated for decommissioning. Instead, a new…
Automation
Due to market changes in the beverage industry, a batch processing plant comprising eight batch tanks at our client’s facility was slated for decommissioning. Instead, a new…
GMP-Qualification, Engineering
A pharmaceutical company required the reliable supply of AP water to eight new production areas, adhering to pharmaceutical standards. This involves the construction of four new, nearly identical AP water storage facilities…
Engineering
As part of a pharmaceutical company´s site expansion, a new AP water storage system with a ring-shaped distribution network was to be created…
Engineering
As part of a pharmaceutical company´s site expansion, a new AP water storage system with a ring-shaped distribution network was to be created…
Automation, GMP-Qualification
A pharmaceutical company needed to replace its aging packaging line with a new one that should meet the highest standards in terms of quality, automation, and efficiency. The company therefore sought expert support in planning…
Automation, GMP-Qualification
A pharmaceutical company needed to replace its aging packaging line with a new one that should meet the highest standards in terms of quality, automation, and efficiency. The company therefore sought expert support in planning…
GMP-Qualification, Engineering
As part of its plant expansion and the construction of eight (8) new production facilities, a pharmaceutical company commissioned Lehmann Engineering with the project coordination and qualification of eleven (11) new AP generators…
GMP-Qualification, Engineering
As part of its plant expansion and the construction of eight (8) new production facilities, a pharmaceutical company commissioned Lehmann Engineering with the project coordination and qualification of eleven (11) new AP generators…
GMP-Qualification, Engineering
A pharmaceutical company pursued the goal of reducing resource consumption and operating costs. To achieve this, a new system consisting of a process water collection system and a reverse osmosis recycling plant was to be developed, constructed, and qualified in accordance with GMP standards…
GMP-Qualification, Engineering
A pharmaceutical company pursued the goal of reducing resource consumption and operating costs. To achieve this, a new system consisting of a process water collection system and a reverse osmosis recycling plant was to be developed, constructed, and qualified in accordance with GMP standards…
Automation, Engineering
An old filling line consisting of two process steps, filling and sealing, is in operation at a pharmaceutical company’s site. Due to the age of the system, future system availability, production reliability, and spare parts supply can no longer be guaranteed. To ensure long-term production capability, a new, modern, and GMP-compliant filling and sealing machine must be installed…
Automation, Engineering
An old filling line consisting of two process steps, filling and sealing, is in operation at a pharmaceutical company’s site. Due to the age of the system, future system availability, production reliability, and spare parts supply can no longer be guaranteed. To ensure long-term production capability, a new, modern, and GMP-compliant filling and sealing machine must be installed…
Automation, GMP-Qualification
One of our pharmaceutical customers, with whom we have a long-standing and trusting business relationship, already had two plants for the production and filling of liquid medications. Due to increased demand, a third plant was to be built.…
Automation, GMP-Qualification
One of our pharmaceutical customers, with whom we have a long-standing and trusting business relationship, already had two plants for the production and filling of liquid medications. Due to increased demand, a third plant was to be built.…
Engineering
In order to be optimally prepared for future growth, a manufacturer of optical products commissioned Lehmann Engineering GmbH to set up a plant-wide communication for the distribution of solvents – from the tank farm to several consumption points…
Engineering
In order to be optimally prepared for future growth, a manufacturer of optical products commissioned Lehmann Engineering GmbH to set up a plant-wide communication for the distribution of solvents – from the tank farm to several consumption points…